01 / Project scopeSwitchgear, feeders, and equipment connections.
Blackstone’s commercial and construction service scope includes switchgear, panelboards, transformers, feeders, and equipment connections. Bring the engineered package and project schedule for review.
- Switchgear installation and replacement
- Panelboard and transformer installation
- Feeder and branch-circuit installation
- Three-phase systems and equipment connections
02 / Project scopePlan procurement and field coordination together.
Equipment schedules, approved drawings, access, installation sequencing, and utility milestones shape the electrical scope. Identify owner-furnished equipment and vendor requirements in the bid package.
- Electrical drawings and specifications
- Equipment delivery and installation milestones
- Existing system information for replacements
- Testing, labeling, and closeout requirements