AI & data center electrical
Data center electrical contractor for AI facilities.
Blackstone Electrical reviews AI facility and data center electrical packages: utility service, switchgear, feeders, equipment power, and backup-power interfaces.
Submit plans for bid ↗Developers · General contractors · Facility teams
01 / Project scopeDefine the power path from service to equipment.
Bring the engineered electrical package for your AI facility, data center, server room, or phased expansion. Blackstone reviews the installation scope from service equipment through distribution and equipment connections with the general contractor, engineer, and vendors. Our team is based in Peoria, Arizona; project location and availability are confirmed during review.
- Switchgear, transformers, panelboards, and feeders
- Branch distribution and rack-power connection requirements
- Grounding, bonding, identification, and equipment interfaces
- New electrical construction and existing-facility expansions
02 / Project scopeAccount for computing and cooling loads together.
Data-center electrical planning needs both the initial and future equipment loads. Include the IT load schedule and the electrical requirements for cooling equipment so the design team can evaluate the whole facility. For AI computing, identify the planned rack loads, phases of deployment, and equipment connections rather than relying on floor area alone.
- One-line diagrams, electrical drawings, and load schedules
- Rack and power-distribution equipment requirements
- Cooling-equipment power and controls boundaries
- Future phases and reserved distribution capacity
03 / Project scopeAssign backup-power and commissioning responsibilities.
Generators, transfer equipment, UPS systems, and critical-load distribution have interfaces that must be clear in the contract documents. Identify the installation, vendor startup, testing, and commissioning responsibilities in the bid package. Redundancy, uptime targets, and equipment selection follow the owner’s engineered requirements; they are not assumed from the words “data center.”
- Generator and transfer-equipment electrical connections
- UPS input/output and bypass interfaces shown on the plans
- Vendor-furnished versus contractor-furnished equipment
- Testing, labeling, documentation, and turnover requirements
04 / Project scopePlan the service connection and any live-site work.
Share the utility correspondence, service requirements, bid deadline, and site restrictions with the electrical plans. For an operating facility, identify permitted outages, access limits, and the agreed sequence for adding or replacing equipment. Blackstone reviews the package and coordination needs before confirming the electrical scope.
- Property address and serving electric utility
- Existing drawings and proposed service changes
- Bid alternates, addenda, and procurement responsibilities
- Access, outage, and energization requirements from the project team